Skip to content
Holt Systems

Concrete recycling crusher automation for mixed C&D feed

Construction and demolition feed changes load by load. Automatic feed control lets a jaw or impact crusher keep working through slabs, fines and rebar without constant intervention.

Request a site assessment
Pile of broken concrete and demolition rubble awaiting recycling

Concrete recycling crusher automation addresses a problem quarries rarely face to the same degree: feed that changes completely from one loader bucket to the next. A construction and demolition (C&D) recycler might move from clean concrete to brick and tile, then to asphalt millings or a load heavy with fines, all within an hour. A crusher fed at a fixed rate cannot respond to those changes, and the result is a plant that alternates between running light and stopping on overload.

Symptoms at a C&D recycling plant

The pattern on a recycling plant without automatic feed control is consistent:

  • Overload trips and stalls. A run of dense concrete slabs loads the crusher beyond its capacity. The motor trips or the crusher stalls, and the plant stops while the chamber is cleared.
  • Blockages at the feed opening. Bridging and blocked feed openings stop production and often require someone to work in a hazardous position to clear them.
  • Running light. After a blockage or trip, operators reduce the feed rate as a precaution and the crusher spends long periods well below its capacity.
  • Variable recycled product. Recycled aggregate and road base sold to a specification need consistent gradation, which is difficult to hold when the crusher load swings constantly.

Each of these increases the cost per tonne of recycled product and the wear on the crusher, feeder and conveyors.

Why mixed feed is difficult to control by hand

Concrete, brick, asphalt and soil break differently and load a crusher differently. A cubic metre of reinforced concrete slab presents a very different load to an impact crusher than the same volume of brick rubble. Moisture adds further variation, as wet fines pack and slow material flow through a jaw crusher.

A vibrating grizzly feeder set to one speed delivers roughly the same volume regardless of what is on it. The operator in the cabin sees the loader and the feeder, but has limited information about crusher load until an overload alarm or a stall. By then the only available action is to stop the feeder.

Concrete recycling crusher automation: how it works

Automatic feed control adjusts feeder speed continuously based on the crusher’s actual load. A variable speed drive (VSD) on the feeder allows it to run at whatever rate the crusher can accept, rather than at a fixed speed.

Concrete recycling crusher automation: load-based feed control Load signals Motor current, and chamber levelon jaw crushers PLC Calculates the feed rate thecrusher can accept Feeder VSD Speeds up or slows the grizzlyfeeder Crusher Held near full load withoutoverloading Crusher load measured continuously
Concrete recycling crusher automation: load-based feed control

The control sequence

  1. 1

    Measure load

    Crusher motor current is measured continuously. On jaw crushers, a radar level sensor above the feed opening adds chamber level.

  2. 2

    Set the feed rate

    A programmable logic controller (PLC) compares load with a target and calculates the feeder speed needed to hold it.

  3. 3

    Ease before overload

    As load rises toward the crusher limit, feed is reduced progressively. It recovers automatically as the load falls.

  4. 4

    Interlock the plant

    The feeder is interlocked with the magnet, discharge conveyor and screens, so feed stops if downstream equipment is not running.

The system responds to the crusher, not to a fixed schedule, so it adapts to each load as it arrives. Operators retain manual control and can override the automatic mode at any time. For quarry cone crushers, where the aim is to keep the chamber full rather than to manage overload, see cone crusher choke feeding.

What steadier feed is worth

Published results for crusher feed control are encouraging. Aggregates Business reports that one quarry operator increased crusher throughput by 9% using adaptive feed control that slows rather than stops the feeder. On recycling plants, much of the benefit comes from reducing stoppages, which the throughput figure alone does not capture.

Demand for recycled aggregate is closely tied to construction activity. A report for the Queensland Department of Resources and Cement Concrete and Aggregates Australia forecasts Queensland quarry material demand to rise 24% to 66.2 million tonnes by 2029 to 2030, and recycled product competes in parts of that market.

Other ways to manage variable feed

  • Pre-sorting and blending. Good stockpile management and loader practice reduce variation and remain worthwhile. They do not remove variation within a load.
  • A larger crusher. Adds capacity at significant cost, but an oversized crusher on variable feed still runs light for much of the time.
  • Manufacturer automation. Modern mobile crushers often include feed control in their own systems, and these are a sound choice where fitted. Older and fixed plants usually have none.
  • A large systems integrator. Suited to new complete plants. For a single crusher circuit, the overheads are often out of proportion to the work.

How a project runs

Every project follows the same five stages. At a recycling site, each stage is planned around incoming material, stockpile commitments and the plant's maintenance days.

  1. 1

    Site assessment

    We observe the plant on typical and difficult feed, and review the crusher, feeder, magnet, screens, drives and existing control panel and drawings.

  2. 2

    Proposal

    A defined scope covering load signals, drive and control changes, a fixed price, a program built around your maintenance days and the projected benefit.

  3. 3

    Off-site build and test

    The control logic is built and tested off-site against simulated crusher load and feeder conditions, including blockage and overload scenarios.

  4. 4

    Installation and commissioning

    Installation and commissioning are completed during a planned maintenance day. Manual feeder control remains available until automatic control is proven.

  5. 5

    Handover and support

    Setpoints are tuned on real C&D feed, operators are shown the new controls, and you receive drawings, program backups and local support.

Why Holt Systems

Feed control for recycling crushers draws on the same principles as quarry crusher control, adapted to a feed that is far less predictable.

Electrical, instrumentation and controls work is carried out under QLD Electrical Contractor Licence 1513082. Installations are completed to AS/NZS 3000 (the Wiring Rules), machine safety functions are designed with reference to AS/NZS 4024, and PLC programs are written in IEC 61131-3 languages and fully documented.

Manufacturer independent
We work across Siemens, Allen-Bradley (Rockwell Automation), Schneider Electric and Omron, and specify hardware on technical merit and local support availability.
Scoped to the requirement
Work is scoped to the specific machine, line or plant area, without the overheads of a large integrator, and quoted at a fixed price.
Reduced shutdown duration
Off-site build and testing means shutdown time is spent on installation and commissioning rather than fault-finding.
Single point of accountability
One accountable lead from site assessment through design, installation and handover.

Recycling crusher automation questions

Does this work on tracked mobile crushers as well as fixed plant?

The principle applies to both. Fixed and semi-mobile plants are the most straightforward. On tracked crushers, the manufacturer's own control system governs the feeder, so the first step is to establish what that system allows to be adjusted and what signals it can share.

Which crusher load signal is used?

For impact crushers, rotor motor current is usually the most reliable signal. For jaw crushers, motor current is commonly combined with a chamber level measurement. Hydraulic pressure can also be used where it is available from the existing controls.

Will it stop us crushing slabs and large pieces?

No. Large pieces still need to be broken to fit the feed opening. Feed control manages how material enters the crusher once it is on the feeder, easing the rate as load rises so the crusher is not overloaded.

How does it handle reinforcing steel?

Tramp metal removal remains the job of the magnet and the operators. The control system can interlock the feeder with the magnet and downstream conveyors, so feed stops if the magnet or a conveyor is not running.

Does automation reduce the number of people on the plant?

That is not the aim. Operators remain responsible for loading, picking and plant safety. The benefit is that their attention is no longer spent adjusting the feeder by hand.

Can it be added to an older plant with relay controls?

Yes. Where the existing controls are relay based, the feed control system can be supplied in its own panel and interlocked with the existing starters, or combined with a broader plant control upgrade.

Request a site assessment

Provide a brief outline of your site and requirements, and we will contact you to discuss the scope and arrange a site visit.

Or email hello@holtsystems.com.au

Your details are handled in accordance with our privacy policy.