Reduce electricity demand charges with automatic load control

On a demand tariff, one half hour with too many large loads running can set the charge for the whole month. Automatic load control keeps that peak down.

Request a site assessment
Pole-mounted electricity supply transformer seen from below

Businesses on a demand tariff can reduce electricity demand charges by controlling when their largest loads run. Under a demand tariff, part of the bill is based not on how much energy the site uses, but on its highest average demand over a short interval. A few minutes in which compressors, pumps, ovens and machines all start together can set the demand charge for the entire month, even if the rest of the month’s demand is far lower.

How demand charges work

Energex explains that on its business demand tariffs, charges are based on both the site’s power demand on the network, measured in 30-minute intervals, and the total energy used. The demand charge applies to the highest half-hourly demand recorded, either at any time in the month or within a defined charging window, depending on the tariff. Regional Queensland sites on the Ergon Energy Network have their own network tariffs, and the retail contract determines how network charges are passed on.

The consequence is that peak demand, not average demand, sets this part of the bill. Typical causes of avoidable peaks include:

  • Simultaneous starts after a break or shutdown, when every machine and compressor starts within minutes
  • Batch loads coinciding, such as ovens heating up while tanks are being filled and compressors are loaded
  • Deferrable loads running at the wrong time, such as water transfer, tank filling and electric heating that could run in a quieter interval
  • No visibility, so staff do not know a peak is building until the bill arrives

Why peaks are hard to manage by hand

A half-hour average is difficult to judge from the factory floor. The loads that create a peak are spread across the site and controlled by different people. By the time anyone notices, the interval has ended and the peak has been recorded. Manual rules, such as staggering start-up times, help but are easily forgotten on a busy day.

How automatic load control helps reduce electricity demand charges

A demand controller measures site demand continuously, projects the current interval’s average, and staggers or delays selected loads when the projection approaches a set limit.

Automatic load control to reduce electricity demand charges Site meter Demand measured continuously Demand controller Projects the 30-minute average Load controls Stagger, delay or reduce selectedloads Site loads Compressors, pumps, heating,machines Site demand measured continuously
Automatic load control to reduce electricity demand charges

How it works

  1. 1

    Measure

    A power meter at the main switchboard measures site demand continuously, including any solar or battery contribution.

  2. 2

    Project

    The controller projects the average for the current 30-minute interval from demand so far and the time remaining.

  3. 3

    Act in priority order

    If the projection nears the limit, controlled loads are delayed or reduced in an agreed priority order, starting with the least critical.

  4. 4

    Restore and report

    Loads are restored in sequence once headroom returns. Demand, actions and overrides are logged and reported.

Start interlocks are often the simplest and most effective measure: large motors are prevented from starting at the same time, and are brought on in sequence instead. Variable speed drives also reduce demand, as described in process pump VSD control, and compressed air sequencing avoids unnecessary compressor starts.

What a lower peak is worth

Alternatives

  • Manual procedures. Staggered start-up times help, but rely on people remembering on every shift.
  • Changing tariff. Sometimes worthwhile, and worth checking with your retailer. It does not reduce the peaks themselves.
  • Batteries. Can reduce peaks effectively but involve significant capital cost. Controlling loads first reduces the battery size needed, if one is still justified.
  • Solar. Reduces energy use, but peaks often occur when solar output is low, so it rarely addresses demand charges on its own.

How a project runs

Every project follows the same five stages. For demand control, the assessment starts with your tariff, your interval meter data and the loads that create your peaks.

  1. 1

    Site assessment

    We review your tariff and interval data, identify when and why peaks occur, and assess which loads can be staggered or deferred without affecting production.

  2. 2

    Proposal

    A defined scope listing the controlled loads and their priority, a fixed price, a program, and the projected reduction in peak demand with its assumptions.

  3. 3

    Off-site build and test

    The demand controller and logic are built and tested off-site, including load priorities, restore sequences and override functions.

  4. 4

    Installation and commissioning

    Metering and control connections are installed during planned stops, under QLD Electrical Contractor Licence 1513082.

  5. 5

    Handover and support

    Limits are tuned against real operation, staff are shown the overrides and reports, and you receive documentation and local support.

Why Holt Systems

Peak demand control is part of our energy controls service, built around your tariff, your loads and the way your site produces.

Electrical, instrumentation and controls work is carried out under QLD Electrical Contractor Licence 1513082. Installations are completed to AS/NZS 3000 (the Wiring Rules), machine safety functions are designed with reference to AS/NZS 4024, and PLC programs are written in IEC 61131-3 languages and fully documented.

Manufacturer independent
We work across Siemens, Allen-Bradley (Rockwell Automation), Schneider Electric and Omron, and specify hardware on technical merit and local support availability.
Scoped to the requirement
Work is scoped to the specific machine, line or plant area, without the overheads of a large integrator, and quoted at a fixed price.
Reduced shutdown duration
Off-site build and testing means shutdown time is spent on installation and commissioning rather than fault-finding.
Single point of accountability
One accountable lead from site assessment through design, installation and handover.

Peak demand control questions

Will load shedding interrupt production?

It should not. Only loads that can be delayed or briefly reduced without affecting product or safety are controlled, such as tank filling pumps, compressors with receiver storage or staggered machine starts. Which loads qualify is agreed with you in the scope.

How does the system know when a peak is coming?

It measures site demand continuously and projects the average for the current 30-minute interval. If the projection approaches the limit, controlled loads are delayed in priority order before the interval ends.

Which tariff applies to us?

That depends on your connection, your network (Energex in South East Queensland or Ergon Energy Network in regional Queensland) and your retail contract. We review your bills and tariff during the assessment.

Can staff override the system?

Yes. Each controlled load has a manual override, and the system records overrides so their effect on demand can be reviewed.

Does this work with solar or batteries?

Yes. Solar generation and battery output are measured as part of site demand, and a battery can be dispatched as one of the controlled resources where its own controls allow.

Is the saving guaranteed?

No. Savings depend on your tariff and how much of your peak comes from loads that can be staggered or deferred. The proposal states the projected reduction and its assumptions.

Request a site assessment

Provide a brief outline of your site and requirements, and we will contact you to discuss the scope and arrange a site visit.

Or email hello@holtsystems.com.au

Your details are handled in accordance with our privacy policy.